189 Carrington Ave, Hurstville – Luxury 2 storey home

This luxury 2 Storey home was completed in 2014. The home is 5 x Bedroom, 4 x Bathroom and 2 garage spaces

The Build took approximately 8 months and consisted of many luxury finishes. The stand out being the excellent brickwork, which won an award with the Boral bricks “think brick awards” in 2015. Just goes to show the quality of the workmanship that took place in this job

 

23 Porter rd, Engadine – 2 storey Duplex

This Duplex was completed late last year, the job is founded on rock on heavily graded block. There was a lot of extensive work in the foundations but nothing too tricky for Nitro Building due to its sister company Nitro Civil which has extensive experience with works in the ground.

Both dwellings consist of 3 bedrooms, 2 bath, spacious living and entertainment areas with excellent views of the national park.

There were various changes throughout the job to make the build more cost-efficient and effective for the clients

 

29-31 Bonanza Pde San Souci – 8 x 3 bedroom townhouses with underground car parking

This Development completed in March 2018, consists of 8 x 3 bedroom luxury townhouses with a tanked underground basement (constructed below the water table)

The basement construction consists of a castec wall which is a continuously poured concrete wall around the perimeter, the external wall consists of core filled blockwork and brickwork with the GF and FF being reinforced concrete slabs

The job took just over a year to complete and all 8 townhouses were purchased by DHA Defence housing Australia.

 

33 Colson cres, Monteray – Luxury 2 storey development

This 2 Storey Luxury home was completed in 2016 consists of 4 x bedroom, 4 x bathrooms and a pool.

The 2 storey home consists of facebrick externally with the internal walls and ff being constructed out of hebel, which is a lightweight construction that has great acoustic and insulative properties

The build took approximately 8 months to complete

 

55 Northcote rd Greenacre – 2 Storey Duplex

This 2 storey duplex was completed in early 2016, consists of 4 bedrooms, 3 bathrooms.

The structure is a full brick concrete construction, the job was built within the project timeline and under budget which left the client extremely happy

The build took approximately 8 months

 

152 Frederick st, Rockdale – Luxury 2 Storey Duplex

This 2 storey Duplex was completed in early 2017, which consists of 4 bedrooms and 3 bathrooms

The structure chosen by the client was a full brick concrete construction which was pricked for its longevity

The job has come up looking great which is evident in the photos

 

840a Henry Lawson drive – Luxury 3 storey Home

This Luxury 3 Storey home consists of 5 Bedrooms, 3 bathrooms and double garage

It was completed in early 2017, with the structure consisting of a full brick concrete construction

The build came in under budget and within the project timeline period, taking a total of 7 months

The client was left extremely happy, recommending Nitro building to family and friends